How to carry out planned maintenance of hot sale un woven fabric making machine in China?
Relying solely on the state maintenance of non-woven equipment is bound to affect the reliability of long-term stable operation of the equipment and increase the risk of equipment ” bursting”. Therefore, the maintenance of non-woven equipment also needs to be carried out according to the plan, which is sufficient to plan the maintenance of Period. Planned maintenance in Period refers to the maintenance method based on time, with preventive nature and timely repair according to the plan, including equipment maintenance, minor repairs and major repairs, and does not require in-depth consideration of the state of non-woven equipment and whether repairs are needed.

This kind of maintenance is a maintenance plan based on the running status of non-woven equipment. That is to say, in the process of equipment inspection, the equipment found abnormal should be queued according to priority and degree of abnormality, timely and appropriately repaired, and Period maintenance should be planned with great attention to pre-inspection and information collection. For timely maintenance, first of all, a general Period schedule for annual maintenance, minor repair and overhaul should be worked out, and then each work plan and acceptance method should be arranged according to the annual general schedule, including the machine number, maintenance time, maintenance content and technical conditions for handover and acceptance after maintenance?

On the one hand, it is better to make a planned maintenance plan with fewer downtime, and make the best use of the downtime to schedule the equipment maintenance as much as possible. On the other hand, take the required maintenance content into account as much as possible, break through the 8 hours of work per day limit, and carry out continuous repair work to reduce the number of times of maintenance downtime. To arrange the maintenance plan, proper maintenance should be carried out. Only the failed parts should be disassembled and repaired. Only damaged parts need to be repaired and replaced, so as to further reduce the consumption of machine parts and downtime and improve the economic benefits of the equipment and the operation rate of non-woven equipment.


EN
AF
AM
AR
AZ
BE
BN
BS
CY
CA
CEB
CS
CO
DA
DE
EO
ET
EU
ES
EN
EL
FI
FR
FA
FY
GA
GU
GD
GL
HY
HR
HT
HA
HAW
HI
HMN
HU
IW
IS
IG
ID
IT
LT
LB
MY
MK
MG
MS
NO
NY
PL
PT
PA
RO
RU
SV
TH
TR
TL
UK
UR
VI
XH
YI
YO
ZU